Cable Tool Drilling
How it works
A weighted drilling string repeatedly rises and falls to break material. Cuttings are removed from the bore between drilling cycles.
Where it fits
Discuss suitability for your ground conditions and well-construction requirements with the contractor.
Planning considerations
The drilling cycle and material removal affect progress. Method selection should account for access, formation and project demand.
← Compare drilling methodsA repeated drilling cycle
The drilling assembly breaks material through repeated impact. The operator removes loosened material and checks the bore as work progresses. Casing and completion details depend on the formation and the intended well design.
Discuss the tradeoffs
Ask your contractor how the ground conditions affect progress, how the bore is supported, and how development and yield testing will be completed. The method alone does not establish the finished water supply.