From your property
to a drilling plan.
Electro-seismology measurements support interpretation of possible groundwater-bearing formations.
Property review
Discuss location, intended water use, existing wells and available records.
Survey planning
Plan sounding lines around site access, utilities and property constraints.
Field measurements
Collect controlled surface measurements along the planned lines.
Interpretation
Process the measurements to estimate possible aquifer depth and thickness.
Recommendation
Prioritize drilling targets and explain the interpreted findings.
Verification
Confirm actual results through drilling, development, pump testing and water quality testing.
Understanding the limits
A survey cannot establish a guaranteed quantity or quality of water. Interpreted zones may not produce a successful well, and nearby wells can have different results.